Cash benefit
Civil cost benefit plus schedule savings.
Cash benefit
Build and stabilize
Land-only benefit
Value impact
Roll-up totals use the Excel workbook's savings convention: positive values are favorable.
| Cash and land recovery | Value |
|---|---|
| Traditional civil cost | |
| Integrated system civil cost | |
| Civil cost benefit | |
| Schedule benefit | |
| Total cash benefit | |
| Raw land recovery value | |
| Asset appreciation benefit |
Traditional pond, paving, and contingency compared with the integrated system.
| Input / Output | Traditional | Integrated System | Delta |
|---|
Recovered constrained land converted into raw land value or incremental income-producing SF.
| Land metric | Value |
|---|---|
| Traditional constrained land | |
| Integrated constrained land | |
| Land recovered | |
| Incremental building footprint | |
| Raw land recovery benefit |
| Lease / cap value engine | Value |
|---|---|
| Annual effective base rent | |
| Annual effective gross income | |
| Annual operating expenses | |
| Annual NOI | |
| Stabilized asset value | |
| Asset value per incremental SF |
GC cost savings and interest carry savings from shortening the civil critical path.
| Schedule item | Traditional | Integrated |
|---|---|---|
| Civil-driven critical path | ||
| Weeks saved | 0.00 | |
| GC cost savings | $0 | |
| Interest carry savings | $0 | |
| Total schedule savings | $0 |
Integrated system after contingency minus traditional after contingency. Negative values mean the integrated system is cheaper.